Post Office Bridge for the City of War
This project consists of the Pre-Cast Box culvert installation approximately 21 foot span over War Creek in Warriormine, WV to replace pre-existing timber deck bridge structure at Warriormine Post Office that was washed away during 2022 flood event.
Drawings
(click to expand/collapse)

Name | Size | ||
18231 APPROVED CONSTRUCTION PLANS - JULY 2025 | 6.1 MB |